![]() ![]() The COSAL Use and Maintenance Manual, SPCCINST 4441.170, in addition to OPNAVINST 4790.4, provides block-by-block instructions for completing these forms. Ship's Configuration Change Form Continuation Page T h e S h i p 's C o n fi g u r a t i o n C h a n g e F o r m Continuation Page (OPNAV 4790/CK(C)), shown in figure 2-5, is simply a continuation page for the OPNAV 4790/CK. The OPNAV 4790/CK form is used both as a closing deferral for reporting the accomplishment of a previously deferred maintenance action that results in a configuration change, and as a completed maintenance action (no prior deferral) reporting a configuration change. From: Chief of ship's maintenance and material management (3M) system, per. Ships Maintenance and Material Management - Department of the OPNAVINST 4790.4F. In between regular overhauls, ships are assigned IMAV with the primary objective being the accomplishment of the maximum amount opnav 4790 2k maintenance, repair and overhaul of the ship. OPNAV 4790.2K FORM PDF MANUALOPNAVINST 4790.2 - The Naval Aviation Maintenance Program (NAMP) OPNAVINST 4790.4 - Ships' Maintenance and Material Management (3-M) Manual Opnav 2k instructions I've played Champion in daoc beta, live, Uthgard 1. OPNAVINST 4780.6 - Procedures for Administering Service Craft and Boats in the U.S. OPNAV 4790.2K FORM PDF SERIALWhat form is used to provide amplifying information, such as drawings and listings? May be used to list multiple serial OPNAVINST 4730.7 - Material Inspection of Submarines Conducted by the Board of Inspection and Survey. What form is used for reporting deferred maintenance actions and completion of maintenance actions that do not result in a configuration change? OPNAV 4790/2k. COMNAVAIRFORINST 4790.2A 10-i CHAPTER 10 Naval Aviation Maintenance Program Standard Operating Procedures (NAMPSOPs) Table of Contents OPNAV 4790/CK. Learn vocabulary, terms, and more with flashcards, games, and other study tools. A (SDVOSB) Service Disabled Veteran Owned Small Business Planned Maintenance System Feedback Report The Planned Maintenance System Feedback Report (OPNAV 4790/7B), shown in figure 2-8, provides the command with an easy method for recommending changes to maintenance requirement cards, ordering replacements for cards that have been lost or mutilated, and notifying the system's command of any Start studying NAVSEAINST 4790.8C, SHIPS` MAINTENANCE AND MATERIAL MANAGEMENT (3-M) MANUAL. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |